Quick answer: On install day, a certified mitigator confirms the plan, cores a hole through the slab (or seals a crawl space with plastic), digs a small pit under it, runs PVC pipe to a fan in the attic, garage or outside, and exhausts it above the roof. They seal major cracks and openings, wire the fan to code, install a warning device such as a manometer, label the system and show you how it works. Many single-suction-point systems are finished in a day. The EPA says to test within 30 days, but not sooner than 24 hours after the fan starts.
Most Rutherford County homeowners only go through a radon installation once, so it helps to know what's coming. The work is noisy for a few hours and dusty in one spot, and when it's done, you'll have a pipe, a fan, a gauge and a label. Here's the typical sequence for a sub-slab system, which the EPA describes as the most common and usually the most reliable method, plus the differences for crawl spaces.
Before the day
- Agree on the layout. Know where the suction point, pipe, fan and exhaust will be. Ask for a sketch or marked photo.
- Clear the work areas. Move boxes from the garage corner, closet or utility room where the pipe will run, and clear a path into the attic if the fan is going there.
- Ask about permits. The fan needs a power source wired to local electrical code. Depending on where you live, an electrical permit may be needed. See radon permits in Murfreesboro and Rutherford County.
- Get the paperwork. The EPA's checklist suggests getting a written contract that covers the work, any guarantee to reduce radon below a level, and warranties.
Step 1: confirm the plan and test the suction
The EPA says the number and location of suction points depend on how easily air moves under the slab and on the strength of the radon source. Many installers drill a few small test holes and use a vacuum and a gauge to see how far suction reaches under the slab. This step can change the plan, such as moving the suction point or adding a second one.
Step 2: core the slab and dig the pit
A core drill cuts a round hole through the concrete, usually a few inches across. The installer then removes soil or gravel from under the hole to make a small open pit, which helps the fan pull from a wider area. This is the loudest and messiest part. Expect a shop vacuum and drop cloths. In a crawl space home, this step is replaced by laying a heavy plastic sheet over the soil, sealing it to the walls and piers, and connecting the pipe under the sheet. See crawl space radon mitigation.
Talk it through with a certified pro. Free referral for Murfreesboro and Rutherford County homes.
(629) 201-4576Step 3: run the pipe and mount the fan
PVC pipe runs from the suction point to the fan. On many slab ranches around Murfreesboro, the pipe goes out through an exterior wall to a fan on the outside, then up past the roof line. Others run through the garage into the attic. The EPA's checklist sets the rules for any route:
- The fan must not be in or below living space; it goes in unconditioned space such as an attic, garage or outside.
- An outdoor fan must meet local building codes for exterior use.
- The exhaust must vent above the roof surface, at least 10 feet above the ground, and at least 10 feet from windows, doors and other openings unless it's 2 or more feet above them.
Pipe should be supported and sloped so condensation drains back toward the suction point. See radon mitigation for slab-on-grade homes for more on slab layouts.
Step 4: electrical
The EPA says electrical connections must be installed according to local electrical codes. Depending on the installer and your jurisdiction, a licensed electrician may wire the fan circuit. Ask who does this and whether an inspection is required.
Step 5: seal
Sealing major cracks and openings, such as gaps around pipes, slab joints, and a sump if there is one, helps the system work and reduces how much conditioned air it pulls from the house. The installer also seals around the core hole where the pipe enters the slab.
Step 6: the warning device and label
The EPA requires a warning device on active systems that can be easily seen or heard, such as a U-tube manometer, an alarm or a light. The contractor should check that it works. Systems must also be clearly labeled, so no one mistakes the pipe for plumbing and cuts into it later. Before the crew leaves, note where the manometer reads. That's your baseline.
Step 7: the walk-through
The EPA says your contractor should fully explain the system, show how it operates and explain how to maintain it, and give you written operating and maintenance instructions plus copies of warranties. Use this time to ask:
- What should the manometer normally read, and what reading should make me call?
- Where is the fan's power switch or disconnect, and what happens if it trips?
- What fan is installed, and how long is its warranty?
- Who runs the follow-up test, and when?
After the install: test it
The EPA says to run a post-mitigation test within 30 days of installation, but no sooner than 24 hours after the system is running with the fan on, using a 2 to 7 day test with windows and doors closed for 12 hours before and during the test. It also recommends an independent follow-up test, either by a separate tester or one you run yourself. After that, retest at least every two years. Our radon levels page explains what the result means, and radon system maintenance covers the years after.
How long does it take?
A straightforward single-suction-point system is often finished in a day. Multiple suction points, crawl space membranes, interior routes through closets and attics, or electrical work by a separate electrician can stretch it out. Ask for a time estimate with your quote. We don't publish prices; the certified professional who visits sets them. To compare installers, see choosing a radon mitigation contractor.
Frequently asked questions
How long does it take to install a radon mitigation system?
A straightforward single-suction-point system is often finished in a day. Extra suction points, crawl space membranes, interior pipe routes or separate electrical work can take longer.
Do I need to be home during radon mitigation installation?
Someone usually needs to be there at the start to confirm the layout and give access, and at the end for the walk-through, when the installer explains the system and the manometer.
How big is the hole for a radon system?
The core hole through the slab is usually a few inches across, sized for the pipe. A small pit is dug out under it before the pipe is sealed in place.
When can I test after a radon system is installed?
The EPA says within 30 days of installation, but not sooner than 24 hours after the fan is running, using a 2 to 7 day test with the house closed.
What should I get from the installer when the job is done?
The EPA says to get an explanation of how the system works, written operating and maintenance instructions, and copies of warranties. The system should be labeled and have a working warning device.
Talk it through with a certified pro. Free referral for Murfreesboro and Rutherford County homes.
(629) 201-4576